go right to article


Projects open for comments at the validation/determination stage

Please select a host country or search the projects by keyword. To read projects details click on the project name. On the projects detail page you will find the PDD and the comment function.

The list of the projects validated/verified/certified by TÜV NORD CERT GmbH may be found at https://cdm.unfccc.int/Projects/projsearch.html (Advanced Search -> sort by DOE TÜV NORD CERT GmbH) or http://cdmpipeline.org/publications/CDMpipeline.xlsx (Tab "CDM_Projects", sort by Validator / Verifier).

Page 1 of 154   [ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 ]
StatusInserted onCountryProjectname/ Description
closed2005-05-13India24 MW installed capacity biomass based renewable electricity generation and consumption by Gujarat Ambuja Cements Limited at its facility in Ropar, Punjab India.
The project acitvity involves grid-connected biomass based power generation, and includes development, design, engineering, procurement, finance, construction, operation and maintenance of a 24 MW (2*12 MW) installed capacity biomass (rice husk) based captive electric generating station.
The poject activity will provide electricity, primarily to Gujarat Abuja Cements Limited´s (GACL) facility at Pupnagar district (Ropar), with part of the electricity wheeled to another GACL unit at Bhatinda, also in Punjab state.
closed2005-09-10GermanyGrubengasnutzung Lohberg 1/2

IN DEM PROJEKT WIRD GRUBENGAS, DAS SOWOHL AUS AKTIVEN ALS AUCH STILLGELEGTEN BERGWERKSTEILEN DER ZECHE LOHBERG AKTIV ABGESAUGT WIRD, IN 6 BLOCKHEIZKRAFTWERKEN MIT ZUSAMMEN 8,148 MW ELEKTRISCHER LEISTUNG ENERGETISCH VERWERTET. DIE ERZEUGTE ELEKTRISCHE ENERGIE WIRD IN DAS ÖFFENTLICHE STROMNETZ EINGESPEIST, WODURCH KONVENTIONELL ERZEUGTER STROM VERDRÄNGT WIRD. DIE ERZEUGTE HEIZENERGIE WIRD IN DAS FERNWÄRMENETZ DER FERNWÄRME NIEDERRHEIN EINGESPEIST, WODURCH ZUSÄTZLICH KONVENTIONELL ERZEUGTE WÄRME AUS HEIZÖL UND ERDGAS VERDRÄNGT WIRD.

closed2005-09-12GermanyGrubengasnutzung Rialisa

IN DEM PROJEKT SOLL GRUBENGAS, DAS IM BEREICH DER EHEMALIGEN ZECHE FRIEDRICH-THYSSEN IN DUISBURG-HAMBORN DIFFUS AUS DEM ERDREICH ENTWEICHT, IN EINEM BLOCKHEIZKRAFTWERK MIT EINER LEISTUNG VON 1,35 MWEL ENERGETISCH VERWERTET WERDEN. DIE ERZEUGTE ELEKTRISCHE ENERGIE SOLL IN DAS ÖFFENTLICHE STROMNETZ EINGESPEIST WERDEN. HIERDURCH WIRD ZUSÄTZLICH KONVENTIONELL ERZEUGTER STROM VERDRÄNGT. ES SOLL EINE WÄRMEAUSKOPPLUNG IN DAS FERNWÄRMENETZ DER STADTWERKE DUISBURG ZUR BEHEIZUNG DES BENACHBARTEN RHEIN-RUHR-SCHWIMMBADS ERFOLGEN.

» PrintPage 1 of 154   [12 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 ]
go to top